St. Aubyn’s School Ground floor side extension to existing sports hall
Type: Educational
Budget: In the region of £150,000
Size: 50 sqm (538 sqft)
Location: Woodford Green, IG8 9DU
District Council: Redbridge
Service: Architectural Services
Project Team Architects: Martyn Pattie & Bilal Malik
Structural Engineer & CDM Consultant: Andrew Firebrace Partnership
Contractor: NC Construction
Building Control: Assent BC
Completion Date: Mid-Late 2018
Project Brief
The project involved designing and delivering a ground floor side extension to the existing sports hall at St Aubyn’s School, enhancing its facilities to accommodate increased use and improve overall functionality. The extension was designed to blend seamlessly with the existing building while meeting the needs of pupils and staff at the school.
Challenges
Space Constraints
The school’s urban location in Woodford Green presented limited space for development without impacting other facilities.
Integration with Existing Architecture
Ensuring the extension harmonised with the original sports hall’s design and materials.
Budget Management
Delivering the project within a contract value of £150,000 while maintaining high-quality standards.
Construction Timeline
Minimising disruption to the school’s day-to-day activities and completing the project within the tight timeframe.
Solutions
We proposed a modern design that maximised the use of available space while respecting the original architecture of the sports hall. The extension incorporated materials and finishes that matched the existing structure, ensuring visual cohesion.
Collaborative Approach
Regular consultations with the school’s management and coordination with structural engineers, contractors, and building control ensured that all requirements were met efficiently.
Cost-Effective Execution
The project team identified cost-saving measures, such as sourcing durable and sustainable materials, without compromising the quality of the build.
Efficient Construction Management
NC Construction implemented a phased approach to construction, minimising disruption to the school’s operations.
Regulatory Compliance
Close collaboration with Redbridge District Council and Assent BC ensured the project adhered to all building codes and educational standards.
The project was successfully completed on budget and on time. The additional space enhances the sports hall’s capacity and utility, providing a valuable upgrade to the facilities.
This project demonstrates thoughtful architectural design by MP Chartered Architects, creating a lasting, positive impact on the sports facilities at this prestigious, local private school.